Friday 22 November 2013

PROJECT 6 : INTEGRATED PROJECT : DESIGN & BUILD 'AN AMPHITHEATRE STAGE


 alhamdulilah...
finally done
 project 6a n 6b
INTEGRATED PROJECT:DESIGN & BUILD ‘AN AMPHITHEATRE STAGE’
project issued:28 oktober 2013
submission date:22 November 2013

hmmm... project mega...hahaha..its more complicated..hhuhu..seriously..not enough sleep..huhu




for project 6a In a group of 16 members, all 12 groups of RUS104 need to design a comprehensive studio project that includes the aspects of site analysis, architectural and interior design, structure and material selection, simple costing, project management, and construction technique of the scale size building (model).The presentation drawings of the proposed amphitheatre stage design should consists of:
-          Key Plan (NTS) and Location Plan (NTS)
-          Site Inventory (NTS)
-          Conceptual Design sketches and relevant bubble diagrams
-      Site Plan (with roof plan of the stage and landscapes) (1:100 scale)
-          Floor Plan (1:50 scale) (along with the dimensions & specifications)
-          Elevations - Front, Rear, Right & Left Sides (1:50 scale)
-          Horizontal and Longitudinal Sections (1:50 scale)
-          3 Details of structural joints (1:20 scale)
-          at least 3 Perspectives drawings
for project 6b
our group is required to prepare two types of project report for their proposed ‘Amphitheatre Stage’, which are:
i)         Progress Report
ii)       Design Proposal Report (final report)
                    Progress Report
 §  As the project runs for 6 weeks, our group is required to produce a progress report for the project on weekly basis. The report should consist the following component:
1)       discussion on the progress of that week;
2)       discussion of the problem that have arisen;
3)       discussion of work lies ahead, photos of current progress;
4)       Schedule of work and cost involved.
                  Design Proposal Report (final report)
 §  The proposal should consist of the following elements/components:
i)                     Purpose, goal and objective
ii)                   Background study and site analysis
iii)                  Proposed design development
iv)                  Construction method, material selection & basic building services
v)                   Elemental Cost Analysis (ECA)
vi)                  Model Cost Estimate
vii)         Project Scheduling







PROJECT 6C : PYSICAL SCALE MODEL